Power

Coal terminal project, Gujarat


Mundra Port and Special Economic Zone Limited is setting up a 35 million TPA coal terminal, West Port located at Tuna Wandh in Mundra in the state of Gujarat, to cater to the ultra mega power plants of Adani Power Limited and Coastal Gujarat Private Limited. We are appointed by State Bank of India as lender's independent engineer to undertake due diligence of the project prior to financial closure and monitor project execution.

Transmission and distribution network design, Maharashtra


Trenching Work in Progress at MADC SEZ, NagpurThe Government of Maharashtra through Maharashtra Airport Development Company Ltd. (MADCL) is developing a Special Economic Zone (SEZ) in vicinity of Nagpur International Airport. Mott MacDonald has designed the power evacuation from Captive Power Plant and distribution of the power at 11kV to bulk consumers and at low tension to small power usage consumers. Mott MacDonald, as Project Management Consultant is assisting MADC in development of the distribution Network at SEZ through reviewing the engineering calculations & drawings of EPC contractor, QA & QC both at site as well at manufacturing plant, contract management and construction supervision, performance tests.

Distribution Reforms Upgrades and Management (DRUM)


33/11 kV Waluj Sub-station under ConstructionDistribution Reforms Upgrades and Management (DRUM) is an USAID funded project focusing on creation of Center of Excellence in Distribution. The Project characteristics included a focus on the “last mile”, Emphasis on high service quality plus commercial viability and effort to create “bankable” Discoms. Through this the new concepts were also tested and breakthroughs (projects) were identified. Aurangabad Urban was taken up as a pilot area for the above study. This project includes construction of 11 33/11 kV sub-stations, underground network, RMU, HVDS, AMR, remote monitoring of performance indicies, IT infrastructure, pre-paid metering, fault passage indicators etc. Mott MacDonald with PA Consulting is providing technical assistance, commodity procurement, implementation oversight support, quality management and project site administration of Aurangabad Division I.

Rambara HEP (76 MW)


Lanco Hydro Energies Private Limited had appointed Mott MacDonald for the preparation of detailed project report. The project envisages construction of 32 m high dam on river Mandakini, 6 km long Head Race Tunnel, underground power house, surge shaft and steel penstocks. The project lies at an elevation of 2650 m above mean sea level. The project envisages generation of 358 GWh energy at 967 m head.

Project Site 76 MW Rambara Hydro Electric ProjectThe project area is approachable by trekking of about 14 km, in fair weather. Due to environmental requirements, the construction of roads in the area is not possible. To facilitate the construction of the project in difficult region and high altitude, innovative technology has been used including provision of two ropeways, use of helicopters, and use of Tunnel Boring Machines etc.





Feasibility & detailed project report 4x300 MW thermal power project


Mott MacDonald has been appointed as Technical Advisor (TA) by VISA Power Limited for undertaking the Techno-Economic feasibility study and preparing detailed project report for 1200 MW project. Scope of services comprises of selection of the most suitable site and preparation of bankable detailed project report comprising following but not limited to and shall cover all provisions/norms framed by CEA for preparation of bankable detailed project report and cover the following aspects (assuming the pre-feasibility / feasibility data for the project are made available to us at the time of start of work).

Retainer consultancy for RLA of 4x210 MW CSEB thermal power plants


Chhattisgarh State Electricity Board has appointed M/S Mott MacDonald as RLA Review Consultant for Residual Life Assessment / Condition Assessment and Performance Evaluation Test Studies on Steam Generator, Turbo Generator along with Balance of Plant of 4x210 MW Hasdeo TPS.

775 MW Luhri hydro electric project


Project Site 775 MW Luhri Hydro Electric ProjectSatluj Jal Vidyut Nigam appointed Mott MacDonald for preparation of detailed project report, bid level drawings, design, tender documents, and specifications etc. for Luhri Hydro Electric Project in the state of Himachal Pradesh. The key features of the scheme are a concrete dam around 48 m high with an integral gated spillway, a river channel to provide a desilting facility with a large capacity, a headrace tunnel around 38 km long on the right bank of the river with an arrangement consisting of either a single tunnel of 11.75 m diameter or twin tunnels of 9.0 m diameter. The project will also feature an underground power station with 4 turbine-generator units and an installed capacity of 700 MW.

1015 MW Nagarjuna thermal power project


Work progress at 1015 MW Nagarjuna Thermal Power Project SiteMott MacDonald is Lender’s Engineer to Power Finance Corporation for this project. MM undertook due diligence of the project prior to financial closure by the Lender. Currently MM is advising Lenders on construction progress of the project.




Biomass power project


Turboatom TPS Projects Limited planned to set – up a 30 MW biomass based Power Plant in Vidharbha region of Maharashtra. The company has tied up with reputed Chinese technology and equipment supplier as an EPC Contractor. Mott MacDonald assisted the company in achieving financial closure.