Architectural
- Space planning, concept development and master plan
- Cost estimates
- Prospective views and models
- Good for construction drawings
- Area grading, exteriors and finishes
Civil/Structural
- Site survey & geo-tech Investigations
- Structural design and construction drawings
- Steel Structure drawings
- Tender and quantities
- Shop drawing checks
- Facility Infrastructure - storm water drains, roads &
pathways
Public health systems
Sewage & strom water services
- Design specifications
- Discharge Unit & Strom Water Calculations
- Design & preparation of Schematic diagram
- Design & preparation of Layout drawings
Domestic water services
- Water Demand Calculations
- Loading Unit Calculations
- Design & preparation of Schematic diagrams
- Design & preparation of Cold & Hot Water Layout
drawings
- Preparation of Design Requirement document/ Specification.
Utilities
- Utility assessment
- Utility packages including piping & accessories
- Piping layout
- Tender and bill of quantities
- Fire protection system
Electrical
- Power requirement assessment,
- Power generation and HT / LT side management
- Power, lighting and earthing layouts
- Emergency power system
- Communication and data networking
- Specifications, tenders and bill of quantities
- Statutory submissions
- Extra Low Voltage (ELV) Systems :
- ELV systems include CCTV, Access Control, Telecommunication,
SMATV, Audio/Video Intercom, Disabled Toilet Alarm, Disabled Refuge
Alarm, Central Clock System, and PA/VA Systems.
- Design & preparation of Layout drawings.
- Design & preparation of Schematic diagrams.
- Lightning Protection System
HVAC
- Heat Load assessment, Extract – Fresh Air - Ventilation &
humidity controls
- System selection – high & low side, Pump sizing, ducting,
etc.
- Under floor, Radiant, Warm Air heating, Two/Four pipe systems
& Heat Pumps
- Design & preparation of Chilled water, Condensate, Air
distribution & Plant room Equipment Schematic diagrams
- System drawings, AHU sizing & ducting layouts
- Tender and bill of quantities
- BMS interlinking
Fire fighting services
- Smoke detection, sprinkler and gas suppression system
- Calculation for Water Storage Capacity and Pump Sizing
Calculations.
- Calculations for Gas Quantity for Fire suppression systems
- Design & preparation of Schematic diagrams
- Design & preparation of Sprinkler/Hydrant/Water Spray/Foam
systems Layout drawings
- Fuel Gas management (as required)
Automation and building management system
- Design and preparation of Architecture diagram
- Design and preparation of Layout drawings
- Preparation of Sequence of Operation/Control Schematic.
- Preparation of Point Schedules.
- Preparation of Mimic diagram
- HVAC services
- Temperature control, ventilation, humidity control and air
quality
- BTU Energy meter & chillier control management
- Electrical services
- Electrical energy management
- Pump, AHU and VFD control
- Public health services
Site supervision and construction management
- Day to day supervision
- Planning, attending queries, monitoring site progress, quality
assurance
- Bills certification
- Witness performance of packages
- Handing over and as-built documentation
Project management
- Co-ordination with owners, contractors, vendors, consultants,
etc.
- Project scheduling, monitoring and control
- Identifying critical activities, grey areas and recommend
remedial measures
- Organizing periodic review meetings
- Progress reporting highlighting concerning issues and
suggesting remedies
- Adherence to Time, Quality and Cost with consistency
Pre construction phase
Project strategy development
- Project Brief
- Scope definition
- Execution Methodology
- Prioritisation / Phasing Plans
- Project costing
- Payment and Audit systems
Multi agency co-ordination
- Co-ordination with Master Planners, Architects, Structural
Surveyors, Design consultants, MEP Engineers, statutory approving
agencies and owner for
- Scheduling activities
- Reviewing/Approving deliverables
- Identification and certification of suppliers
- Value addition
Tendering
- Reviewing and quantity verification as provided by architects
and engineers
- Short listing of qualified contractors/sub contractors
- Firming up general and specific terms and conditions with
owner
- Tender floating, pre bid meeting, techno commercial evaluation,
contract finalization.
Construction phase
- Project Coordination
- Site supervision/Construction Management
- Quality Management
- Contract management
- Project documentation
- Material / Stores Management
- Reporting
- Health, Safety and Environment
Project coordination
- Holding Meetings-Kick-off, review, etc with contractors
- Monitoring Activities and schedule
- Cost planning and monitoring
- Holding Meetings-Kick-off, review, etc with contractors
- Monitoring Activities and schedule
- Cost planning and monitoring
Site supervision/construction management
- Lead by Construction Manager
- Daily supervision by team of site engineers
- Problem solving
- Technical compliance review
- Constructability issues
Quality management
- Quality directives
- Execution methodologies implementation
- Ensuring Quality/testing laboratory thru agencies
- Quality Audits
- Quality reports
Safety and environment
- Safety guidelines/directives
- Strict adherence/Compliance
- Planning for public health
Contract management
- Contract administration for cost and schedules
- Correspondences/Communication
- Payments and Bills certification
- Rate approvals
- Administer change orders
Project documentation
- Maintaining ‘IFC’ drawings
- Tender specification, Contract terms and conditions
- Record of all correspondences and communications
- Quality records
- Project Schedule tracking records
Materials/stores management
- Selection of items/material
- Maintaining inventory
- Stores management
- Material reconciliation
Reporting owner for
- Project Progress/Milestones
- Cost Analysis
- Quality Compliances
- Site Safety and environment
- Forecasting: Areas of concern
Post construction phase
Final documentation
- “As Built” drawings from respective contractors
- Operation and maintenance manuals from system suppliers
- Issue final “check/punch list” to contractors
- Certify final payments
Handing over
- Issue Project Documentation
- Project completion report
- Collaborate with owner’s staff taking over